How TenXLabs Builds a Client Website: Our Full Process
From the first call to deployment — a transparent look at how we scope, build, and ship client projects without the typical agency chaos.
Most agencies are a black box. You pay, you wait, you get something back that may or may not match what you asked for. We operate differently. Here's the exact process we run for every website project.
Week 1: Discovery and Architecture
Before any design or code, we get aligned on three things: goals, audience, and success metrics. What is this site supposed to do — generate leads, build credibility, drive appointments? Who is the buyer, and what do they need to see to take action?
We also audit the existing digital presence: the current site, Google Business Profile, social accounts, and competitor landscape. This gives us context that makes everything downstream better.
From there, we build the site architecture — the full page map with content priorities for each page.
Week 2: Design and Content
We build in Figma first. Every page gets a desktop and mobile design before a single line of code is written. The client reviews and approves the design. Changes here are fast and cheap; changes after development are slow and expensive.
Content runs parallel to design. We don't wait for clients to write their own copy. We handle it — using their brand voice, their service specifics, and SEO best practices.
Weeks 3–4: Development
We build in Next.js. Every project gets performance-optimized from the start: proper image optimization, lazy loading, caching, and clean semantic HTML for SEO. We don't bolt these on at the end — they're part of the build.
Every component is mobile-first. Every page is tested across Chrome, Safari, and Firefox on desktop and mobile before QA is called.
Week 5: QA, SEO, and Launch
QA covers functionality, responsiveness, speed (Core Web Vitals), and content accuracy. We run a full technical SEO audit: title tags, meta descriptions, schema markup, canonical tags, sitemap, robots.txt.
Launch is coordinated — DNS changes, SSL confirmation, redirect setup for any URLs that changed, Google Search Console submission.
Post-Launch
We monitor for 30 days post-launch. If something breaks, we fix it. We also deliver a simple analytics dashboard so the client can see traffic, leads, and conversions without needing to decode Google Analytics.
The whole process takes 30–45 days. No surprises.
More from the Blog
The Complete Next.js Performance Guide for 2026
Core Web Vitals, image optimization, caching strategies, and everything else you need to ship a Next.js app that scores green across the board.
Why Most Agency Websites Fail at SEO (And How to Fix Them)
Most agency websites are beautiful and technically broken. Here's the technical SEO checklist we run on every site we build.
React Native vs Native Development in 2026: The Honest Answer
We've shipped over 30 apps using both approaches. Here's when React Native wins, when native wins, and why the answer is usually React Native.
